We go a lot done this week:

Robin M. & I removed furniture from the library & covered the bookcases with plastic in preparation for the floor refinishing on Tuesday June 2
Charles & Chris F. continued power washing the core area. Mike Karen Kowalski let us borrow their power washer to help speed up our progress as we continue with the YRUU Patio, Core & Amphitheater
Michael Scott found many broken sprinklers and dead batteries on the watering solenoids. This is important as the vegetation goes from being overgrown to being dried- out this summer
Ken Shultz worked on the fallen tree in Pinecone class room , cut branches and loaded the dumpster with Betsy
Jim Hagen worked 5 days in the last 2 week cleaning drains and cutting numerous tree branches
Jon added additional sand bags for our Amphitheater erosion control project
Betsy & Debbie have filled the dumpster with weeds, branches & dead heads every week for the past 3 months. Wow!

This our task list as it presently stands.
Sweep leaves and shovel as needed in the Amphitheater and Core. ​Done!! Performed by Debbie H. , Jon, Betsy and Jim Hagen
We are now working on power washing the Yruu Patio, Core & Amphitheater .Debbie, Chris F. & Charles Alvarez
Cut brush around path lights.​ Done!! Performed byBetsy, Debbie, Darron , Eriyn & Kellen
Fix faulty path lights Done! Performed By Ed
Replace ‘Exit’ bulbs in the Hall
Pull weeds and brush along the paths, around the parking lots and at the classrooms. Mostly Done by Betsy & Debbie
Paint white lines on amphitheater steps
Sand / stain benches and tables in core area- Done!! – Debbie H, Jon L, Betsy & Ed
Sand / stain Amphitheater podium . Done! Performed by Debbie, Betsy & Ed
Replace torn sandbags on the slope behind amphitheater Jon is working on it !
Fix sprinklers/ soaker Michael Scott
Dig out drain pit between YRUU Bldg & Parking lot Jim Hagen is working on it!
Dig out YRUU Bldg patio Done !Performed by Jon & Jim
Paint front steps
Paint bridges
Move furniture in the library so that the contractor can stain the floor
Replace faulty water heater in office